A full-scale eVTOL air taxi measured 45.2 dBA at 500 m in full wing-borne flight during NASA’s acoustic flight test of the Joby prototype (Pascioni et al., AIAA/CEAS Aeroacoustics Conference 2022). The noise story does not end at the aircraft, though: simulated UAM noise exerted influence up to a horizontal radius of about 400 to 600 m in an urban setting (Lee et al., JASA 2026), which makes vertiport siting a neighbourhood question. Commercial service is arriving unevenly, with EHang delivering 36 eVTOL aircraft in a single quarter of 2026 (EHang Q2 2026 results, company figures) while Archer reported about 15% of its Phase 4 FAA compliance documents received at year-end 2025 (Archer Form 10-K 2025). We aggregated data from AIAA and JASA acoustics papers, NASA technical reports, the Quiet Drones 2026 conference, FAA and EASA rulemaking, the GAO, and SEC filings and releases from Joby, Archer and EHang. For how conventional aircraft noise is counted around airports, see our airport community noise exposure roundup.
TL;DR
- 45.2 dBA maximum level at 500 m for the Joby prototype in full wing-borne flight at 103 kt (Pascioni et al., AIAA/CEAS Aeroacoustics Conference 2022).
- At the same observer distance, eVTOL sounds were 6 to 13 dB lower in A-weighted sound exposure level than helicopters (NASA HULC Technical Memorandum 2026).
- Residents of high-noise ZIP codes needed flyovers 8.6 dB quieter to match the annoyance of quiet-area residents (Krishnamurthy, Quiet Drones 2026).
- The US Stage 3 helicopter flyover limit is 82 dB SEL up to 3,125 lb maximum takeoff weight (14 CFR Part 36 Appendix J).
- Joby says its aircraft stays below 65 dBA at 100 m from the flight path during takeoff and landing (Joby Aviation press release 2022, vendor claim).
- Simulated UAM noise exerted influence up to a horizontal radius of about 400 to 600 m (Lee et al., JASA 2026).
- A deep learning noise-map predictor ran more than 1,800 times faster than ray tracing with a 2.56 dB error (Kim and Lee, JASA 2024).
- The FAA powered-lift rule took effect on January 21, 2025, with a Special Federal Aviation Regulation that runs 10 years (Federal Register final rule 2024-24886).
- EASA’s VTOL noise proposal NPA 2025-03 closed for comments on January 9, 2026 (EASA NPA 2025-03).
- EHang delivered 36 eVTOL aircraft in the second quarter of 2026 (EHang Q2 2026 results).
- Joby reported for-credit testing in the fifth and final FAA certification stage, with 17 aircraft in production (Joby Q3 2026 results).
- Archer had received about 15% of its Phase 4 compliance verification documents at year-end 2025 (Archer Form 10-K 2025).
1. Measured eVTOL Noise and the Helicopter Yardstick
The cruise figure manufacturers quote holds up under independent ground microphones: 45.2 dBA at 500 m in full wing-borne flight (Pascioni et al., AIAA/CEAS Aeroacoustics Conference 2022). Here dBA means A-weighted decibels, which discount the low frequencies the ear hears poorly, and “wing-borne” means the wing, not the propellers, carries the aircraft’s weight, so the propellers can turn much more slowly. The same test showed the footprint grows at the two ends of the trip: approaches, when the propellers tilt back up and carry the aircraft as it slows, covered far more ground at high levels than departures.
Against helicopters, a later laboratory listening test split one question into two answers. At the same sound exposure level (SEL, the total sound energy of one flyover compressed into one second), listeners rated eVTOL and helicopter sounds about equally annoying; at the same distance, the eVTOL sounds were much quieter and less annoying. The advantage is a lower source level, not a friendlier kind of sound, which is why helicopter certification limits remain the natural yardstick. The impulsive blade slap that dominates many helicopter approaches is covered in our helicopter rotor BVI noise roundup. Sources: the flight test paper record, the HULC listening test report and the helicopter noise limits in 14 CFR Part 36 Appendix J.
| Metric | Value | Source |
|---|---|---|
| Acoustic flight test of the Joby prototype (summer 2021, near Big Sur, California): scale and key results | 58-channel microphone array, 6 test days, more than 100 test points at 31 conditions; 45.2 dBA (53.4 dB unweighted) maximum at 500 m in full wing-borne flight at 103 kt, and +1.3 dBA at 110 kt; ground area inside the 65 dBA contour about twice as large on approach as on departure; hover levels varied 2 to 5 dB within a run | Pascioni et al., AIAA/CEAS Aeroacoustics Conference 2022 |
| HULC laboratory listening test (July 2025; 40 subjects; 123 sounds from 4 helicopters and 6 UAM vehicles): UAM compared with helicopter | At the same A-weighted SEL, annoyance offsets of 0.8 dB (departure), -0.4 dB (cruise) and -1.0 dB (approach); at the same observer distance, SEL 6 to 13 dB lower and mean annoyance 2.4 to 2.6 points lower on a 0 to 10 scale for UAM | NASA HULC Technical Memorandum 2026 |
| Joby’s own figures for its aircraft after the 2021 test | 45.2 dBA overhead at 500 m (1,640 ft) at 100 knots; below 65 dBA at 100 m (330 ft) from the flight path during takeoff and landing (vendor claims) | Joby Aviation press release, May 10, 2022 (Joby’s own claim) |
| US Stage 3 flyover noise limit for helicopters up to 3,125 lb (1,417 kg) maximum certificated takeoff weight | 82 dB SEL, rising by 3.0 dB SEL per doubling of weight above that | 14 CFR Part 36 Appendix J (FAA, CFR 2024 edition) |
| US Stage 2 flyover noise limit for helicopters, for comparison | 82 dB SEL up to 1,737 lb (787 kg), rising by 3.0 dB SEL per doubling of weight above that | 14 CFR Part 36 Appendix J (FAA, CFR 2024 edition) |
| Reference flyover height above the microphone for helicopter noise certification | 492 ft ±50 ft (150 m ±15 m) | 14 CFR Part 36 Appendix J (FAA, CFR 2024 edition) |
Most recent available data: the Joby flight test of summer 2021, published in June 2022; no newer public dBA results for a production eVTOL were found during this research. The 45.2 dBA value is a maximum level scaled to 500 m, while the helicopter limits are SEL values at 150 m, so the numbers in this table cannot be compared directly. The six UAM vehicles in HULC were anonymized, with sounds from manufacturer recordings or auralizations (computer-generated sound), and the Joby press release is a company statement.
2. Community Annoyance: Where Listeners Live Changes the Verdict
The expectation was masking: people used to traffic noise should notice a quiet air taxi less. A remote listening test across three US metro areas found the opposite. Participants from high-noise ZIP codes needed a flyover 8.6 dB quieter to be as annoyed as participants from quiet areas (Krishnamurthy, Quiet Drones 2026), and the gap appeared in all three metro areas tested.
Early routes are planned for dense, loud cities, so a single national limit could under-protect exactly the places where flights start. On the design side, two independent acoustics papers point at the same lever: tonal and broadband content, which fan and rotor design can change, drive what listeners perceive. Public acceptance was flagged early, when the GAO listed quiet operation among the conditions the industry must prove. Sources: the remote test paper, the DLR fan study, the rotor perception study and the GAO report.
| Metric | Value | Source |
|---|---|---|
| VANGARD remote listening test (August 27 to September 30, 2025; New York City, Dallas-Fort Worth, Los Angeles): sample and main result | 353 participants analyzed (151 from low-noise areas, 202 from high-noise areas, where high-noise means a ZIP code background level exceeded half of the time, L50, of 50 dBA or more); flyovers had to be 8.6 dB quieter (95% CI [7.7, 9.7]) for high-noise-area participants, from 6.0 dB in Los Angeles to 9.4 dB in New York City | Krishnamurthy, Quiet Drones 2026 conference paper |
| DLR concept aircraft with 26 low-speed ducted fans: effect of quieter fan designs (three designs compared) | Tonality, loudness and roughness reduced well above one noticeable difference | Schade et al., JASA 2025 |
| Dominant source of perceived noise from a 35% scale notional eVTOL rotor in hover (2 to 5 blades tested) | Broadband noise, for every blade count | Tinney and Valdez, JASA 2026 |
| GAO review of advanced air mobility: stakeholders interviewed and acceptance conditions | 36 stakeholders (a non-generalizable sample); industry must show aircraft are safe, reliable and quiet | GAO-22-105020, May 9, 2022 |
Context: a remote test runs on participants’ own computers and headphones, so playback level is less controlled than in a laboratory; six participants who changed their computer volume were excluded before analysis. The GAO review (2022) is the most recent available GAO stakeholder review of this sector.
3. Vertiport and Route Noise Modelling
A horizontal radius of about 400 to 600 m (Lee et al., JASA 2026) is how far simulated UAM noise exerted influence in an urban setting. A vertiport therefore has an acoustic neighbourhood that crosses many property lines, which turns siting into a land-use question before it is an aircraft question.
Modelling tools are catching up. Machine learning predictors now trade a small error for very large speed gains, and early route simulations in Los Angeles and Dallas-Fort Worth suggest the answer depends on which threshold a city picks. Airports already manage that tension with quota counts and curfews, covered in our airport noise quota and curfew roundup. See the noise impact range study and the deep learning noise propagation study.
| Metric | Value | Source |
|---|---|---|
| Horizontal radius over which UAM noise exerted influence in an urban simulation (K-UAM Grand Challenge, SoundPLAN software, noise hemisphere method) | Up to about 400 to 600 m | Lee et al., JASA 2026 |
| Deep learning predictor of UAM noise propagation in a city: training data, error and speed compared with ray tracing | Trained on 45,000 two-dimensional noise maps; 2.56 dB root mean square error; more than 1,800 times faster | Kim and Lee, JASA 2024 |
| Simulated hourly and twice-hourly eVTOL operations in the Los Angeles and Dallas-Fort Worth areas | Little impact on sensitive structures at the 65 dBA guideline threshold; significantly more communities affected at 55 dBA and above | Guerrero et al., Research Square preprint 2025 (not peer reviewed) |
| Joby New York City flight campaign (April 2026): use of existing heliports | Flights from JFK to Downtown Skyport and the West 30th Street and East 34th Street heliports; Lower Manhattan and Midtown to JFK in under 10 minutes (company claim) | Joby Aviation press release, April 27, 2026 |
Context: the Los Angeles and Dallas-Fort Worth results come from a preprint that has not been peer reviewed, and its abstract reports the thresholds without population counts. Joby’s New York City campaign release describes the campaign as both week-long and 10-day.
4. Noise Rules: FAA, EASA and the Certification Gap
The FAA powered-lift rule took effect on January 21, 2025 (Federal Register final rule 2024-24886), but it settles who may fly these aircraft and under which operating rules, not how loud they may be. Aircraft-specific noise standards still come one design at a time, and the environmental yardstick remains DNL 65 dBA (Day-Night Average Sound Level, a 24-hour average that weights night noise more heavily).
Europe is moving toward a single rulebook: EASA’s NPA 2025-03 (a Notice of Proposed Amendment, the formal draft-rule consultation) would set noise requirements for VTOL-capable aircraft in a delegated act with acceptable means of compliance. Sources: the powered-lift final rule, EASA NPA 2025-03 and the UAM Noise 2025 Update technical publication.
| Metric | Value | Source |
|---|---|---|
| FAA powered-lift final rule (pilot certification and operations, with a Special Federal Aviation Regulation) | Published November 21, 2024 (89 FR 92296, 227 pages); effective January 21, 2025; the Special Federal Aviation Regulation runs 10 years | Federal Register final rule 2024-24886 (FAA) |
| FAA environmental review threshold and aircraft-specific noise rules for air taxis | Order 1050.1G (effective July 3, 2025) keeps DNL 65 dBA, and an increase of 1.5 dBA or more in areas already at or above it counts as significant; rules of particular applicability (noise standards written for one aircraft model) published for 7 drone models, none yet completed by an urban air mobility manufacturer | UAM Noise 2025 Update technical publication (Rizzi et al., 2026) |
| EASA NPA 2025-03, noise requirements for VTOL-capable aircraft: timeline | Published August 22, 2025; comment period extended from November 21, 2025 to January 9, 2026 | EASA NPA 2025-03 |
| EASA NPA 2025-03: stated aims | New VTOL-capable designs minimise noise; a level playing field for manufacturers; certified noise levels available to the competent authorities | EASA NPA 2025-03 |
| FAA noise certification standards for tiltrotors | Final rule published January 8, 2013 (78 FR 1133), effective March 11, 2013 | Federal Register final rule 2013-00111 (FAA) |
Context: the tiltrotor rule provides uniform US noise certification standards for tiltrotors, aircraft whose rotors tilt between hover and cruise, as the six propellers of the Joby prototype do.
5. Certification and Launch Timelines: Joby, Archer and EHang
EHang delivered 36 eVTOL aircraft in the second quarter of 2026 (EHang Q2 2026 results), and its pilotless EH216-S has operated under Chinese air operator certificates since 2025. In the United States the leaders are still in final certification flight testing, where Type Inspection Authorization (TIA, the FAA’s permission for its own pilots to fly tests that count toward the type certificate) is the key milestone.
Read the timelines with care: each company reports certification progress in its own units (Joby by stage, Archer by share of documents), so the figures are not directly comparable. Sources: EHang second quarter 2026 results, Joby third quarter 2026 results and Archer’s Form 10-K.
| Metric | Value | Source |
|---|---|---|
| EHang EH216-S type certificate from the Civil Aviation Administration of China (CAAC) | Announced October 13, 2023, after more than 1,000 days of work and more than 40,000 test flights (company figures) | EHang Form 6-K exhibit, October 13, 2023 |
| EHang production certificate and first air operator certificates | Production certificate in April 2024; air operator certificates for 2 operators (Guangzhou and Hefei) announced March 30, 2025 | EHang Form 6-K exhibits, August 22, 2024 and March 31, 2025 |
| EHang second quarter 2026 | 36 eVTOL aircraft delivered (35 EH216 series, 1 VT35); revenue RMB77.9 million (US$11.5 million); trial operations stable for 17 months at the two sites | EHang Form 6-K exhibit, August 25, 2026 |
| Joby FAA type certification progress | First FAA-conforming aircraft began TIA flight testing (announced March 11, 2026); by the third quarter of 2026, for-credit testing in the fifth and final stage, with 17 aircraft in production | Joby Aviation press releases, March 11 and November 4, 2026 |
| Joby commercial launch plans | First passengers in Dubai expected in 2026 (stated February 25, 2026); first eVTOL Integration Pilot Program flights completed in Texas and Florida (stated November 4, 2026) | Joby Aviation press releases, February 25 and November 4, 2026 |
| Archer Midnight FAA type certification status at year-end 2025 | Phase 3 substantially complete; about 15% of Phase 4 compliance verification documents received | Archer Aviation Form 10-K for 2025, filed March 2, 2026 |
| Archer Midnight piloted Salinas to Monterey round trip | About 9 minutes per leg compared with over 35 minutes by car; eVTOL Integration Pilot Program operations planned later in 2026 | Archer Aviation second quarter 2026 results, August 10, 2026 |
| GAO stakeholder forecast for advanced air mobility operations | Many stakeholders forecast limited operations within the next 5 years (stated May 2022) | GAO-22-105020, May 9, 2022 |
Context: the EHang test-flight and day counts are the company’s own figures from its type certificate announcement. Joby’s November 4, 2026 results did not restate the Dubai timing, so whether first Dubai passengers flew in 2026 should be checked against the next filing.
Summary: eVTOL Air Taxi Noise Footprint by the Numbers
| Metric | Value | Source |
|---|---|---|
| Joby prototype maximum level at 500 m, full wing-borne flight at 103 kt | 45.2 dBA | Pascioni et al., AIAA/CEAS Aeroacoustics Conference 2022 |
| Joby takeoff and landing noise 100 m from the flight path | Below 65 dBA (vendor claim) | Joby Aviation press release, May 10, 2022 |
| US Stage 3 helicopter flyover limit up to 3,125 lb | 82 dB SEL | 14 CFR Part 36 Appendix J (FAA) |
| Reference flyover height for helicopter noise certification | 492 ft (150 m) | 14 CFR Part 36 Appendix J (FAA) |
| Simulated eVTOL operations in Los Angeles and Dallas-Fort Worth | Significantly more communities affected at 55 dBA and above than at 65 dBA | Guerrero et al., Research Square preprint 2025 (not peer reviewed) |
| Horizontal radius of UAM noise influence in an urban simulation | About 400 to 600 m | Lee et al., JASA 2026 |
| Deep learning noise predictor error and speed-up compared with ray tracing | 2.56 dB RMS error; more than 1,800 times faster | Kim and Lee, JASA 2024 |
| Quieter ducted fan designs on a 26-fan DLR concept | Tonality, loudness and roughness reduced well above one noticeable difference | Schade et al., JASA 2025 |
| Dominant perceived noise source of a notional eVTOL rotor in hover | Broadband noise | Tinney and Valdez, JASA 2026 |
| FAA powered-lift rule effective date and Special Federal Aviation Regulation length | January 21, 2025; 10 years | Federal Register final rule 2024-24886 (FAA) |
| EASA NPA 2025-03 comment deadline | January 9, 2026 | EASA NPA 2025-03 |
| Stakeholders interviewed for the GAO advanced air mobility review | 36 | GAO-22-105020 |
| EHang EH216-S type certificate announced | October 13, 2023 | EHang Form 6-K exhibit, October 13, 2023 |
| EHang eVTOL deliveries, second quarter 2026 | 36 | EHang Form 6-K exhibit, August 25, 2026 |
| Joby certification stage and aircraft in production, third quarter 2026 | Fifth and final stage; 17 aircraft | Joby Aviation third quarter 2026 results |
| Archer Phase 4 compliance verification documents received, year-end 2025 | About 15% | Archer Aviation Form 10-K for 2025 |
| Archer Salinas to Monterey flight time per leg compared with driving | About 9 minutes vs over 35 minutes | Archer Aviation second quarter 2026 results |
Methodology and Sources
- Pascioni, Watts, Houston, Lind, Stephenson and Bain, Acoustic Flight Test of the Joby Aviation Advanced Air Mobility Prototype Vehicle, 28th AIAA/CEAS Aeroacoustics Conference, June 2022 (AIAA-2022-3036).
- Vaughn, Krishnamurthy, Aumann, Tuttle and Christian, Helicopter and Urban Air Mobility (UAM) Laboratory Comparison (HULC) Psychoacoustic Test, NASA Technical Memorandum, February 2026.
- Krishnamurthy, Urban Air Mobility Noise Remote Test Response by Geographic Area and Comparison to In-Person Test, Quiet Drones 2026, TU Delft.
- Rizzi et al., Urban Air Mobility Noise: 2025 Update on Current Practice, Gaps, and Recommendations, NASA/TP-20250011527, May 2026.
- Lee, Wie, Lee and Haan, Determination of the noise impact range of urban air mobility in urban areas using noise hemisphere, JASA 159(3), 2026.
- Kim and Lee, Deep learning based prediction of urban air mobility noise propagation in urban environment, JASA 155(1), 2024.
- Schade, Merino-Martinez, Moreau et al., Psychoacoustic evaluation of different fan designs for an urban air mobility vehicle with distributed propulsion system, JASA 157(3), 2025.
- Tinney and Valdez, On the perception of noise from a notional eVTOL rotor in hover, JASA 159(1), 2026.
- Guerrero, Molloy, Artemyev and Clarke, Informing Metropolitan Noise Mitigation for Urban Air Mobility Operations, Research Square preprint, November 2025.
- FAA, 14 CFR Part 36 Appendix J, helicopter noise limits, CFR 2024 edition via govinfo.
- FAA, Integration of Powered-Lift: Pilot Certification and Operations final rule, Federal Register, November 21, 2024.
- FAA, Noise Certification Standards for Tiltrotors final rule, Federal Register, January 8, 2013.
- EASA, NPA 2025-03 noise requirements for VTOL-capable aircraft, August 2025.
- GAO, Transforming Aviation: Stakeholders Identified Issues to Address for Advanced Air Mobility (GAO-22-105020), May 2022.
- Joby Aviation press releases: low noise footprint following NASA testing (May 10, 2022), fourth quarter 2025 results (February 25, 2026), first FAA-conforming aircraft flight (March 11, 2026), New York City flight campaign (April 27, 2026) and third quarter 2026 results (November 4, 2026).
- Archer Aviation, Form 10-K for fiscal year 2025 (filed March 2, 2026) and second quarter 2026 results (August 10, 2026).
- EHang Holdings, Form 6-K exhibits on SEC EDGAR: type certificate (October 13, 2023), second quarter 2024 results with production certificate (August 22, 2024), air operator certificates (March 31, 2025) and second quarter 2026 results (August 25, 2026).
- Data watch: the 45.2 dBA cruise value is a maximum A-weighted level scaled to 500 m, while US helicopter limits are SEL values at 150 m, so the two numbers are not comparable without a full conversion. Joby’s 2022 release gives the flyover speed as 100 knots, while the NASA paper scales the 103 kt full wing-borne flyover. The VANGARD paper gives 110 large-response participants in one section and 111 in its conclusion; we used the 353 analyzed total, which matches 243 plus 110. HULC used anonymized UAM recordings and auralizations rather than named production aircraft. Certification progress figures (Joby stages, Archer document share, EHang test counts) are company statements, not FAA or CAAC data. The NASA and Joby flight test (2021) and the GAO review (2022) are older than three years and remain the most recent available sources of their kind. EASA’s final opinion after NPA 2025-03 and Joby and Archer TIA results are the main updates expected next.
Last updated: November 8, 2026. We update this roundup quarterly, and the next refresh is expected when Joby and Archer publish their fourth quarter 2026 results and EASA issues its opinion following NPA 2025-03.